{
  "tool_id": "art-170-eudr-readiness-diagnostic",
  "kernel_id": "art-170-eudr-readiness-diagnostic",
  "display_name": "EUDR Readiness Diagnostic",
  "tool_version": "1.0.0",
  "mandate_type": "compliance_mandate",
  "purpose": "A-F EUDR readiness diagnostic across six dimensions: scope mapping, geolocation data quality, DDS submission readiness (TRACES NT), country risk assessment, risk mitigation documentation, and 5-year retention system. Returns readiness_grade (A-F), readiness_score (0-100), gaps list, and dual enforcement deadlines (large/medium 2026-12-30; micro/SME 2027-06-30). Terminal node of the eudr-supply-chain-risk-and-traceability chain. Zero network, zero PII. Reg. EU 2023/1115.",
  "control_description": "A-F EUDR readiness diagnostic across six dimensions: scope mapping, geolocation data quality, DDS submission readiness (TRACES NT), country risk assessment, risk mitigation documentation, and 5-year retention system. Returns readiness_grade (A-F), readiness_score (0-100), gaps list, and dual enforcement deadlines (large/medium 2026-12-30; micro/SME 2027-06-30). Terminal node of the eudr-supply-chain-risk-and-traceability chain. Zero network, zero PII. Reg. EU 2023/1115.",
  "declared_inputs": [
    "art-169-eudr-supply-chain-traceability-linker"
  ],
  "declared_outputs": [],
  "kernel_digest": "sha256:89338dd3a78df645d37c683e4dc45829e7112a641353153a208273f33288a798",
  "trust_label": "deferred -- deterministic source published, zkVM proof not yet generated",
  "data_vintage": "2026-07-10",
  "last_validated": "2026-07-10",
  "conformance_fixtures_vendored": true,
  "compute_proof_ready": "ready",
  "wave": 30,
  "source_url": "https://ainumbers.co/chaingraph/art-170-eudr-readiness-diagnostic.html",
  "generated_at": "2026-07-25T20:02:55.601Z"
}
