OpenChainGraph Wave 3 · PNR-01 · infrastructure_mandate · DORA (EU) 2022/2554

DORA ICT Cascade Simulator

Monte Carlo simulation of ICT incident propagation across a financial institution's dependency graph. 500 stochastic BFS paths model cascade failure from a single point of compromise through interconnected systems — returning time-to-disruption percentiles, P(DORA reporting threshold breached), and critical path identification aligned to Articles 17–25.

simulate_ict_cascade GPU-Sim DORA Art. 17–25 Zero PII 500 paths Chains: ART-09 → PNR-01 → PTG-01
Simulation Parameters pnr-01
Defines the dependency graph structure. Node count: 16–18.
Fraction of a node's dependencies that must fail to trigger cascade propagation.
Mean time to recovery multiplier applied to each node's base MTTR.
Links this simulation's provenance to an upstream DORA incident classification.
—
—
—
P50 breach (h)
—
P5 worst-case (h)
—
P(DORA report) %
—
Critical path node
Time-to-Critical-Breach Distribution (hours)
P(Cascade Reach) by Node
Critical Path — Top Failure Chains
AP2 Artifact — infrastructure_mandate
—
Configure & Run
Select a topology, choose the initial failure node, and click RUN SIMULATION to see cascade impact probabilities and DORA reporting exposure.